Pavement Rehabilitation
Typical Method Statement For Pavement Rehabilitation Works For Expressway
Join us on LinkedIn!
Join us on Facebbook!
Follow Us on Twitter!
Subscribe to our RSS Feed!
Labels:
pavement layer
,
photo
Typical Pavement Layer
Typical Pavement Layer for Expressway
Newer Post
Older Post
Home
Pavement Works
Milling
Bridge Expansion Joint
Resurfacing 50mm
Mill and Pave 50mm
Mill and Pave 110mm
Mill and Pave 200mm
Regulating
Porous Asphalt
Stone Mastic Asphalt
Micro Surfacing
Paving Fabric
Interlocking Concrete Pavement
Cement Bound Material
MFR injection systems
drainage
Sub Soil Drain Type I
Sub Soil Drain Type II
Shoulder Drain (Pre Cast Block)
Cascade Drain (Chute Drain)
Guardrail Works
Jacking
Concrete Pad
Blog Archive
April
(8)
March
(10)
February
(2)
January
(1)
Popular Posts
Cascade Drain (Chute Drain)
Drain shall be excavated besides the shoulder drain at interval specified by the Engineer. The width and depth shall be as specifie...
Mill and Pave 50 mm (50 mm ACWC)
Area to be repaired is demarcated and confirmed at site with the Engineer representative. The milling work shall be...
Regulating
After receiving the confirmed profile level from the Engineer: The positions of points from survey data are marked on the pavement ...
Milling
Milling works shall proceed on the marked area using the milling machine to the required depth. For milling of more than 50 mm ...
Labels
pavement
drainage
guardrail
bridge
chain block
concrete pad
cost saving
heavy duty hydraulic jack
jacking
pavement layer
photo
recycle
undulation
water crossing
View My Stats
Powered by
Blogger
.