Interlocking Concrete Pavement



  1. Area to be treated is demarcated and confirmed at site with the Engineer representative. 
  2. Existing ICP blocks are removed and excavation is carried out to achieve the require depth.
  3. Upon achieving the required depth, the required treatment is carried as per work order scope work: laying of DBM (refer 2.3.E.iii) or CBM.
  4. Fine sand layer is laid to the 20 mm thickness prior to ICP installation works.
  5. Installation of ICP shall be started with restraining blocks at the edge of area, followed with ICP blocks.
  6. Fine sand is the poured on the completed ICP layer and is ensured that all the blocks are in tightly installed.  The remaining sand is then swept to have clean surface.