- If concrete pad is required, the guardrail post is extracted first from the footing.
- A square pit by the dimension of 300 mm x 300 mm x 200 mm (as shown in the drawing) is dug.
- The guardrail post then place into the pit, suspended to the required height. String can be used to ensure uniform level is achieved on all the selected raised guardrails.
- Concrete grade 20 is then poured into the pit, properly compacted and let to cure for 3 days.
Labels:
guardrail
Concrete Pad
Posted by
Engineer Malaysia