Interlocking Concrete Pavement
- Area to be treated is
demarcated and confirmed at site with the Engineer representative.
- Existing ICP blocks are removed
and excavation is carried out to achieve the require depth.
- Upon achieving the required
depth, the required treatment is carried as per work order scope work: laying
of DBM (refer 2.3.E.iii) or CBM.
- Fine sand layer is laid to the
20 mm thickness prior to ICP installation works.
- Installation of ICP shall be started
with restraining blocks at the edge of area, followed with ICP blocks.
- Fine sand is the poured on the
completed ICP layer and is ensured that all the blocks are in tightly installed. The remaining sand is then swept to have
clean surface.